Local Law 97 Compliance in Manhattan: An Owner's Guide

If you own or manage a larger building in Manhattan, Local Law 97 is now part of your yearly routine. The law sets greenhouse gas emissions limits for covered buildings and requires an annual report to the NYC Department of Buildings (DOB). This guide explains who is covered, how the Covered Buildings List works, what the annual report involves, and where building upgrades can trigger separate DOB filings.

Who Is Covered by Local Law 97

According to DOB, Local Law 97 generally applies to:

In Manhattan, that reaches a wide range of property: office buildings, prewar and postwar apartment buildings, co-ops and condos, hotels, and mixed-use buildings. Most private buildings follow Article 320 of the law. Certain affordable housing and houses of worship follow a separate path under Article 321. DOB's rules for these pathways are found in 1 RCNY §103-14 (Article 320) and 1 RCNY §103-17 (Article 321).

How the Covered Buildings List Works

DOB publishes a Covered Buildings List (CBL) that identifies tax lots, by borough, block and lot (BBL), containing buildings that meet the size threshold. A single tax lot can hold one building or several, but compliance applies at the building level, identified by the Building Identification Number (BIN). The 2026 list lists compliance pathways by BIN and also shows covered buildings for related sustainability laws (LL84, LL87 and LL88) in the same document.

The list assigns each building a compliance pathway. DOB describes pathways labeled CP0 through CP4. Examples include Article 320 limits beginning in 2024, 2026 or 2035, Article 321, and a separate pathway for City buildings and NYCHA. If a building fits more than one pathway, DOB says the owner must comply with the highest tiered pathway.

Being on the list, or being left off it, is not the final word. If you believe the square footage, rent regulation status or another listed fact is wrong, DOB directs owners to file a CBL dispute (Ticket #1) through the LL97 reporting portal with supporting documentation. See DOB's Covered Buildings List FAQs for details.

Annual Emissions Reporting to DOB

Covered building owners submit an annual emissions report to DOB. The first report was due May 1, 2025, and DOB states that reports are due by May 1 of every year after. Reports are submitted through DOB's LL97 reporting portal (BEAM). Under Article 320, emissions limits began in 2024 and become stricter in 2030. The city's stated goals are a 40% emissions reduction by 2030 and net zero by 2050.

The report compares your building's actual emissions, calculated from its energy use, against the limit for its occupancy and pathway. DOB also recognizes certain deductions and alternative compliance options, including limited offsets, distributed energy resources and beneficial electrification. Each has its own documentation requirements, so check DOB's filing guides before relying on one.

The Registered Design Professional's Role

DOB requires the annual report to be certified by a registered design professional (RDP), meaning a New York State licensed architect or professional engineer. Owners should plan ahead: gather utility and fuel records early, confirm the building's gross floor area and occupancy mix, and give the RDP enough time to review before the May 1 deadline.

Upgrades That May Require DOB Filings

Many owners respond to Local Law 97 with physical upgrades, and much of that work is not a paperwork exercise. Depending on scope, projects can require permits filed in DOB NOW: Build, which has separate filing types for Boiler Equipment, Mechanical Systems, Plumbing, Electrical, Energy, Solar and general Alteration work. Common examples include:

Boiler replacement or removal. Replacing an oil or gas boiler, or removing one when a building switches to another heating source, is handled through Boiler Equipment filings. DOB NOW includes a boiler removal notification process.

Heat pumps and heating electrification. Moving to electric heating or hot water typically involves mechanical work, and often electrical service upgrades and possibly structural support for rooftop or exterior equipment. Each discipline may need its own application and licensed professional.

Rooftop solar and other on-site systems. Solar installations have their own filing type in DOB NOW: Build.

A qualified professional should review the scope before work starts so the correct applications are filed, approved and signed off. Work done without required permits can create violations that complicate later sales, refinancing or future filings.

Penalties, as Published by DOB

DOB's published penalty amounts for Article 320 buildings are:

Exceeding the emissions limit: the amount over the limit, in tons of CO2 equivalent, multiplied by $268 per year.

Failing to submit the annual report: the building's floor area multiplied by $0.50, for each month the report is not submitted. DOB's enforcement guidance notes a 60-day period after May 1 during which penalties are not assessed.

For Article 321 buildings, DOB lists a $10,000 penalty for failing to file the compliance report on time and a $10,000 penalty for failing to demonstrate compliance through an available pathway. DOB also describes penalty mitigation for owners who show good faith efforts, and a process to request adjustments for certain external or financial constraints. The main DOB LL97 page links to the current rules and filing guides.

Local Law 97 compliance usually involves several parties: the owner or managing agent, an energy consultant, the registered design professional who certifies the report, and the licensed trades doing any upgrade work. AM Expediting Drafting & Design Works LLC helps Manhattan building owners with the DOB side of the process, including drafting, preparing and filing DOB NOW applications for boiler, mechanical, plumbing, solar and alteration work, and resolving related violations. To talk through your building's upgrade plans, call (718) 971-0617.

Planning LL97 Upgrades in Manhattan?

AM Expediting can prepare and file the DOB NOW applications for boiler, mechanical, solar and alteration work. Call (718) 971-0617 to discuss your building.

(718) 971-0617 — Call Now

AM Expediting Drafting & Design Works LLC · 76-18 Rockaway Blvd, Woodhaven, NY 11421 · (718) 971-0617 · Serving Queens, Brooklyn, Manhattan, the Bronx and Staten Island.